I needed a fuel system to plumb up before I got the motor completed...
I got the short block completed and neutral balanced...
The assembly of the long block began. I used MLS head gaskets and head studs to secure the DART heads
Got it completed and buttoned up the CSR electric water pump as well...
I started mounting the fuel cell and the battery box up
Started installing some of the interior trim pieces as well
I needed something to keep it cool so picked this up at a swap meet
Started mounting the fuel system
Decided it was time to lay the motor in
Decided to start dressing up the under hood area
Needed something for this screamer to breathe thru so gave Kurgan Motorsports the call on a set of these bad boys
Got them installed
You can also see the tubular suspension which is all new with tubular A-Arms, Coil overs and C/C plates...
I needed a shifter for the PA super comp C4 with a T-Brake so I chose one of these
Wires/DEI boots
I needed to wire all the accessories so I chose this panel to help make thing simple and trust me it did big time!!